TECH-CITY logo
TECH-CITY
Case studies

Measurable outcomes, repeatable patterns

Examples of digitization, ERP–shopfloor integration, error-proofing, and inventory systems with clear results.

Spare Parts Store Digitisation

Industrial manufacturing
Outcome
60–70% faster GRR → dispatch material movement
Problem

Manual packing and dispatch verification caused delays, data inconsistencies, and compliance risk at high throughput.

Solution implemented
SCMOPSAIDCCompliance labeling
Results
60–70%
Faster GRR → dispatch movement
Lower manual verification effort
Higher dispatch accuracy
Before vs After
BEFORE
  • Paper/manual checks at packing
  • Delayed ERP updates
  • Limited traceability on shipment units
AFTER
  • Scan-verified packing workflow
  • Real-time ERP interfacing
  • QR traceability + compliant labels
Compliance workflowERP interfaceQR traceability

Assembly Line Digitisation

Assembly operations
Outcome
~20% recovery of lost production capacity
Problem

Spreadsheet-based reporting hid downtime drivers and slowed corrective actions across shifts.

Solution implemented
MFGOPSERP integrationIoT/PLC data capture
Results
~20%
Recovered production capacity
Unplanned downtime
First-pass yield
Before vs After
BEFORE
  • Manual downtime logs
  • Delayed KPI visibility
  • Inconsistent production data
AFTER
  • Real-time downtime capture
  • Automated ERP transactions
  • Shift-ready dashboards and alerts
Downtime captureQuality monitoringERP automation

Lean Inventory Management & JIT

Supply chain
Outcome
25–30% inventory reduction with stable output
Problem

Excess line-side stock increased handling, space usage, and planning noise, without improving output stability.

Solution implemented
SCMOPSJIT workflowsInventory visibility
Results
25–30%
Inventory reduction
Replenishment predictability
Inventory turns
Before vs After
BEFORE
  • Overstocked line-side areas
  • Reactive replenishment
  • Low visibility on consumption signals
AFTER
  • Consumption-driven controls
  • JIT replenishment loops
  • Real-time inventory dashboards
Consumption-drivenJIT replenishmentInventory turns

Kitting, Sequencing & Poka‑Yoke

Line-side feeding
Outcome
Near‑zero picking and kitting errors
Problem

Incorrect kits and sequence breaks caused frequent line stops, rework, and high dependence on supervision.

Solution implemented
SCMOPSPoka‑Yoke SystemsPick‑to‑Light
Results
≈0
Picking & kitting errors
Line stoppages
Takt time stability
Before vs After
BEFORE
  • Manual kit checks
  • Frequent sequence breaks
  • High supervision dependency
AFTER
  • Error-proof kitting validation
  • Sequence-controlled feeding
  • Predictable line-side execution
Error proofingTakt stabilityLower supervision
Maruti Suzuki case study visual

Maruti Suzuki Robotic Platform & Layout Engineering

Automotive body weldingMaruti Suzuki
Outcome
Faster engineering release for a 30-robot body-shop layout
Problem

The program required precise robotic platform and layout engineering to support a dense automation setup with reliable manufacturability.

Solution implemented
Process & Layout DesignMechanical DesignRobotic Simulation/Process Simulation2D Detailing
Results
30
Robots covered in full layout scope
20m x 20m
Detailed layout footprint
11m x 8m
Platform engineering scope
Before vs After
BEFORE
  • Distributed design inputs across automation and layout teams
  • Higher coordination load for release-quality 2D/3D outputs
  • Risk of delays in implementation-ready documentation
AFTER
  • Integrated layout + platform engineering package
  • Structured 3D and 2D detailing for release readiness
  • Cleaner handoff to manufacturing and site execution teams
YAAN EngineeringRobotic layout2D + 3D detailing
Wooshin case study visual

Wooshin Welding Fixture Engineering Program

Automotive fixtures and toolingWooshin India Pvt. Ltd.
Outcome
End-to-end fixture design support across multiple body line programs
Problem

Multiple body-line fixture programs needed high-quality design and detailing output within delivery windows while maintaining tooling robustness.

Solution implemented
Tool DesignMechanical Design & 2D DetailingProcess DevelopmentProject Management
Results
2
Major fixture programs executed
LH/RH
Long member line coverage
E2E
Design-to-release support delivered
Before vs After
BEFORE
  • Complex fixture requirements across different line programs
  • High dependency on synchronized design and release workflows
  • Tight delivery windows for manufacturing support
AFTER
  • Program-specific fixture concepts and detailed releases
  • Improved alignment between tooling design and fabrication
  • Streamlined documentation package for execution
YAAN EngineeringWelding fixturesTool design
Want a similar outcome?

Share your current process and constraints. We’ll propose a phased plan with feasibility, ROI estimation, and a rollout strategy built for adoption.